Energy / Solutions
Start with the problem, not the product.
Most people arriving here do not need “an 800 kVA containerised genset”. They need a connection that is late covered, a shutdown window held, a breakdown fixed tonight, a test witnessed, or a stage that stays lit. Pick the situation and we will get to the equipment second.

Five situations
Which one is yours?
- 01
Bridging power
Bridging power for utility connection delays
- — The ADDC / DEWA / SEWA / FEWA connection has slipped and handover is at risk.
- — The substation or transformer is on order with a long lead time.
- 02
Shutdown & turnaround
Planned shutdown & turnaround power
- — Switchgear, transformer or UPS maintenance requires the permanent supply de-energised.
- — A plant turnaround needs power for tooling, lighting and temporary facilities.
- 03
Emergency response
Emergency & breakdown power response
- — Mains supply has failed and the standby set did not start — or there is no standby set.
- — An existing generator has broken down mid-contract and the load is off.
- 04
Commissioning power
Commissioning & testing power
- — Plant needs energising for testing before the permanent supply is live.
- — A consultant or third party requires witnessed acceptance testing.
- 05
Event power
Event & temporary venue power
- — A festival, concert, exhibition or sporting event needs temporary supply.
- — Stage, broadcast or LED walls need a supply that cannot drop mid-show.
Not sure which applies?
Describe it in a sentence.
Call 800-PLANT and tell us what is happening on site. We will work out what it needs — and if it is urgent, we will tell you a realistic arrival time, not an optimistic one.