Energy / Distribution
Transformers & distribution.
Site-side power distribution equipment for temporary and project power — transformers, distribution panels, cable runs, switchgear and earthing kits. Engineered as part of an integrated Strong Plant Energy package, or supplied standalone alongside a client genset.

What we supply
Power, distributed.
01
Transformers
Step-up and step-down transformers (typically 11 kV / 415 V / 230 V) for grid-side commissioning and site distribution.
02
Distribution panels
Pre-built primary and secondary distribution panels — MCBs, RCDs, metering, sized to your site load schedule.
03
Cable runs & connectors
Single-core and multi-core cable on drums, PowerLock connectors, Camlocks and 16 / 32 / 63 / 125 / 200 A socket outlets.
04
Switchgear
Synchronising panels, paralleling controllers and ATS for redundant N+1 standby configurations.
05
Earth-bonding & protection
TT / TN earthing schemes, earth-electrode kits, and protective bonding to meet UAE Civil Defence and DEWA / ADDC requirements.
06
Test & commission
Insulation testing, polarity testing, ELCB / RCD trip-time verification and load-bank commissioning before energisation.
Engineered to specification
- PowerLock & Camlock connectors
- 16 / 32 / 63 / 125 / 200 A socket outlets
- Synchronising & paralleling panels
- DEWA / ADDC / Civil Defence compliant
What's the load schedule?
Send the single line.